React on MIGRATE project’s deliverable: power system stability issues brought by increasing power electronics penetration

The MIGRATE project has released its deliverable D1.1, which aims at identifying and prioritizing all power system stability issues brought by the increasing penetration of PE in the different control zones covered by the TSOs of the MIGRATE consortium.

Power system stability issues are described and, further to a collective work through questionnaires to TSOs, scored and ranked in  terms of impact  on the network, according to three dimensions – severity, probability  and timeframe of impact.

 

You are very welcome to feedback on this deliverable and give your opinion on the proposed ranking!

A synthesis of the deliverable accompanied with a brief questionnaire is available here.

You can download the full deliverable following this link.